What Happens During a Switchboard Upgrade? A Perth Electrician Walks You Through It

Nov 3
4 min read

A switchboard upgrade replaces your home's old fuses or outdated breakers with a modern board fitted with circuit breakers and safety switches, then tests every circuit before the power is handed back. The work is planned in advance, carried out by a licensed electrician, and followed by an Electrical Safety Certificate. Here is exactly what happens, step by step, so you know what to expect before you book.



New switchboard with labelled circuit breakers beside a three phase meter in a Perth home, installed by Wiser Electrical Services


How do I know my switchboard needs upgrading?

The usual signs are ceramic fuses, a board with no safety switches or only one, breakers that trip regularly, scorch marks or a burning smell, and a board with no room left for new circuits. Planning to add air conditioning, solar, a battery or an EV charger is another common trigger, because those all need capacity and protection an older board may not have.


Our guide on why switchboard upgrades matter covers the warning signs in more detail. This post covers what happens once you have decided to go ahead.


What happens before the upgrade?

It starts with an inspection of your existing switchboard and meter box. A licensed electrician looks at the age and condition of the board, how many circuits the home has, whether the home is single phase or three phase, and what the household plans to add in the future. That determines the size of the new board and how much spare space to leave.


You should get a clear quote and an explanation of what will be replaced, and a time booked that suits you. Because the power has to be off for part of the job, it helps to plan around things like working from home, fridges and freezers, and any medical equipment.



Electrician testing safety switch trip time on a new switchboard with a multifunction tester in Perth, Wiser Electrical Services
[Safety switch trip time test, passed]

What happens on the day of the upgrade?

The electrician isolates the power, removes the old board and fuses, and installs the new enclosure and protection devices. Each circuit is then connected back in, sorted into its own protected circuit and fitted with the right size breaker for its job, whether that is lighting, power points, the stove, hot water, air conditioning or a pool pump.


Modern boards usually use safety switches or combined breaker and safety switch devices, called RCBOs, so a fault on one circuit only cuts power to that circuit rather than several at once. How long the job takes depends on the size of the home, the number of circuits and whether the board is single or three phase, and your electrician will give you a timeframe when they quote.


Why does every circuit need a safety switch?

A safety switch, or RCD, cuts the power in a fraction of a second if it detects electricity leaking to earth, such as through a person. Under the AS/NZS 3000 wiring rules, new and altered home installations generally need safety switch protection on their final circuits, which makes a switchboard upgrade the ideal time to make sure every circuit in your home is protected.


It also covers you if you ever sell or rent the property, since WA requires at least two RCDs protecting all power and lighting circuits. Our guide to RCD and smoke alarm rules in WA explains those rules.


How is the new switchboard tested?

Before the power is handed back, a licensed electrician tests the installation with specialised equipment. That includes checking the earthing, testing that the wiring insulation is sound, confirming every circuit is connected correctly, and measuring how quickly each safety switch trips when it detects a fault.


That last test matters most. A safety switch that looks fine but trips too slowly may not protect you properly. Testing each one with a multifunction tester and confirming a pass is how you know the protection actually works.



Electrician testing safety switch trip time on a new switchboard with a multifunction tester in Perth, Wiser Electrical Services
[Safety switch trip time test, passed]

What should a finished switchboard look like?

A finished switchboard should be neat, solid and clearly labelled. Every breaker should be marked with what it controls, such as lights, power, stove, hot water, air con or pool, so you can find the right switch quickly in an emergency. At Wiser, we also label each board with who installed it and our licence number.


Spare space for future circuits is a sign of a well-planned board. It means adding an EV charger, battery or extra air conditioning later is a simple job rather than another upgrade.


What paperwork should I get afterwards?

For installing work like a switchboard upgrade, a licensed electrical contractor in WA must give you an Electrical Safety Certificate within 28 days of finishing the job. It confirms the work was completed, checked and tested, and met WA's requirements at the time of testing.


Keep it with your property records. It is useful for insurance, and it is one of the first things a buyer, tenant or property manager may ask about. If you do not receive it, ask your contractor for it.


Book a switchboard upgrade in Perth

A switchboard upgrade is one of the most valuable safety improvements you can make to an older home, and it sets the house up for everything you might want to add later. Done properly, it is planned, tidy, tested and fully documented.


Wiser Electrical Services is a licensed Perth electrical contractor (EC 16847) providing residential and commercial electrical work across the Perth metro area. We provide switchboard upgrades and safety switch installations for homes in Balcatta, Stirling, Osborne Park, Karrinyup, Gwelup, Hamersley, Westminster, Nollamara, Dianella, Doubleview and the surrounding suburbs. Request a call back or phone 0422 766 960 to book a switchboard inspection.